b stack radar

Asta Powerproject vs TraceAir (2026): Pricing, Features & Verdict

Asta Powerproject is our pick, scoring 6.3/10 against 5.3/10 for TraceAir on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Integration score (7/10 vs 3/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

Winner

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

TraceAir logo

TraceAir

5.3/10

TraceAir is a drone-based site monitoring platform for U.S. homebuilders and land developers. It tracks earthwork, grading, drainage, and construction progress against design plans.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
TraceAir logo
TraceAir
Scores
Overall Rating6.3/105.3/10
Scalability7/107/10
Analytics7/107/10
Support7/106/10
Security5/104/10
Cost4/104/10
Customization7/105/10
Ease of Use5/106/10
Integration7/103/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
Digital TwinNot listed
Drone InspectionNot listed
GIS and MappingNot listed
Inspection AutomationNot listed
LiDAR ProcessingNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs TraceAir cost by team size

Team sizeAsta PowerprojectTraceAir
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and TraceAir suit

AudienceAsta PowerprojectTraceAir
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10It is built for homebuilders and land developers tracking grading, earthwork, and vertical construction.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.7/10Large national builders use it, and it offers portfolio dashboards and enterprise packaging.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.Not rated
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Maintenance TeamsNot rated2/10It has no work order or asset maintenance functions.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Real EstateNot rated8/10It covers land acquisition feasibility, lot yields, and sales and investor collaboration for residential developers.
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.Not rated
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.Not rated
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (TraceAir does not)
  • Higher Integration score (7/10 vs 3/10)
  • Higher Customization score (7/10 vs 5/10)

TraceAir logo
Why choose TraceAir

  • Higher Ease of Use score (6/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

TraceAir logo
TraceAir

Pros

  • The service is fully managed. TraceAir handles drone flights, processing, and hosting, so builders need no hardware or pilots of their own.
  • Earthwork tools are extensive: surface comparison against design grade, cut/fill balance, stockpile volumes, and exports to a rover for staking.
  • Unlimited users per project lets subcontractors, sales teams, and executives share one view of the site.
  • The vendor claims adoption by 18 of the top 20 U.S. builders, and the NAHB named it Best Software Solution in 2024.

Cons

  • Prices are not published, so every project needs a quote.
  • Licensed surveying is limited to four U.S. states.
  • There is almost no public information on integrations or an API.
  • Independent user reviews are close to nonexistent on G2 and Software Advice.
  • Software Finder notes that users need training to use the full feature set.

Not sold on either?

Air Inspection Automation (AiA) logo

Air Inspection Automation (AiA)Our product

Plans DJI drone inspection missions for power line towers from LiDAR scans: it finds the towers, places photo stops, checks clearance, and splits the route into battery flights.

Made by the team behind b stack radar. Shown here because it fits this topic. It is not part of our rankings. How we rank tools

Frequently Asked Questions

Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.3/10 for TraceAir. The largest gap is in Integration: 7/10 for Asta Powerproject and 3/10 for TraceAir.

Asta Powerproject has a free plan; TraceAir does not list one.

Related Comparisons