Asta Powerproject vs Geotab (2026): Pricing, Features & Verdict
Geotab is our pick, scoring 7.5/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Security score (9/10 vs 5/10). Only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.
Geotab
7.5/10
Geotab is a telematics platform that combines GO vehicle tracking devices and MyGeotab software to manage fleet tracking, maintenance, safety, compliance and fuel use for businesses and government fleets.
Feature-by-Feature Comparison
| Feature | ![]() | G Geotab |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 7.5/10 |
| Scalability | 7/10 | 9/10 |
| Analytics | 7/10 | 8/10 |
| Support | 7/10 | 6/10 |
| Security | 5/10 | 9/10 |
| Cost | 4/10 | 5/10 |
| Customization | 7/10 | 8/10 |
| Ease of Use | 5/10 | 6/10 |
| Integration | 7/10 | 9/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Free ProjectViewer | Contact for pricing |
| Features | ||
| Asset Registry | Not listed | |
| Condition Monitoring | Not listed | |
| GIS and Mapping | Not listed | |
| Inspection Checklists | Not listed | |
| Predictive Maintenance | Not listed | |
| Preventive Maintenance | Not listed | |
| Safety and Compliance | Not listed | |
| Work Orders | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs Geotab cost by team size
| Team size | Asta Powerproject | Geotab |
|---|---|---|
| 1 user | Contact for pricing | Contact for pricing |
| 5 users | FreeProjectViewer | Contact for pricing |
| 10 users | FreeProjectViewer | Contact for pricing |
| 25 users | FreeProjectViewer | Contact for pricing |
| 50 users | FreeProjectViewer | Contact for pricing |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and Geotab suit
Asta Powerproject fits construction better; Geotab fits field teams better.
| Audience | Asta Powerproject | Geotab |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 6/10Asset trackers and engine-hour maintenance cover vehicles and equipment, though Geotab is fleet-centric. |
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | 7/10The Geotab Drive app handles inspections and compliance for drivers in the field. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 8/10Geotab serves Fortune 500 fleets, offers open APIs and BI connectors, and runs in more than 130 countries. |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 6/10Tech.co suits it to small fleets, but reviews note above-average cost and a learning curve. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | Not rated |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | Not rated |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
| Government | Not rated | 9/10Geotab holds FedRAMP authorization and FIPS 140-3 validation, and it serves US federal fleets. |
| Logistics | Not rated | 9/10Geotab includes HOS/ELD, IFTA, routing and fuel tools built for trucking and delivery fleets. |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | Not rated |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | Not rated |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | Not rated |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | Not rated |
| Utilities | Not rated | 7/10Utilities run large service fleets that need tracking, maintenance and safety management, which Geotab covers. |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (Geotab does not)
- Higher Support score (7/10 vs 6/10)
- Better fit for construction (10/10 vs 6/10)
GWhy choose Geotab
- Higher Security score (9/10 vs 5/10)
- Higher Scalability score (9/10 vs 7/10)
- Better fit for field teams (7/10 vs 5/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
GGeotab
Pros
- Open platform: a free SDK and APIs, a Marketplace with 400+ listed integrations, IOX sensor expansion, and a BI Data Connector
- Strong security credentials, including FedRAMP, FIPS 140-3, ISO 27001 and SOC 2, suit government and regulated fleets
- Hardware is bundled in the subscription, and moving from GO Core to GO Plan needs no device swap
- FMCSA-certified ELD covers HOS, DVIR and IFTA, with over 100 HOS rulesets
- Scales from small fleets to millions of connected vehicles in more than 130 countries
Cons
- No public pricing: quotes come from resellers, and some resellers require multi-year contracts
- Support quality and responsiveness vary by reseller
- Reviewers report a steep learning curve for exception rules and custom reports
- Users report that the mobile app is slow or crashes, and TechRadar notes a low iOS app rating
- No in-app traffic overlays, and fuel management and predictive maintenance require the higher plan
Not sold on either?
Frequently Asked Questions
Geotab scores higher on our Industrial & Infrastructure Software criteria: 7.5/10 against 6.3/10 for Asta Powerproject. The largest gap is in Security: 5/10 for Asta Powerproject and 9/10 for Geotab.
Asta Powerproject has a free plan; Geotab does not list one.
Asta Powerproject is the better fit for construction: we rate it 10/10 for them, against 6/10 for Geotab.


