Asta Powerproject vs RedTeam Flex (2026): Pricing, Features & Verdict
Asta Powerproject is our pick, scoring 6.3/10 against 6.2/10 for RedTeam Flex on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Scalability score (7/10 vs 6/10). Only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

RedTeam Flex
6.2/10
Cloud construction management and project financial software for commercial general contractors and construction managers, covering preconstruction through closeout and billing.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 6.2/10 |
| Scalability | 7/10 | 6/10 |
| Analytics | 7/10 | 6/10 |
| Support | 7/10 | 8/10 |
| Security | 5/10 | 4/10 |
| Cost | 4/10 | 5/10 |
| Customization | 7/10 | 7/10 |
| Ease of Use | 5/10 | 6/10 |
| Integration | 7/10 | 6/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Free ProjectViewer | Contact for pricing |
| Features | ||
| Document Control | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs RedTeam Flex cost by team size
| Team size | Asta Powerproject | RedTeam Flex |
|---|---|---|
| 1 user | Contact for pricing | Contact for pricing |
| 5 users | FreeProjectViewer | Contact for pricing |
| 10 users | FreeProjectViewer | Contact for pricing |
| 25 users | FreeProjectViewer | Contact for pricing |
| 50 users | FreeProjectViewer | Contact for pricing |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and RedTeam Flex suit
| Audience | Asta Powerproject | RedTeam Flex |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 9/10Built specifically for commercial general contractors and construction managers, from preconstruction through billing. |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 4/10Reviewers say setup and advanced configuration feel heavy for smaller teams. |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | 7/10The vendor's marketing targets mid-size to large construction firms, and the starting price is around 10,000 USD per year. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | Not rated |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | Not rated |
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | Not rated |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | Not rated |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | Not rated |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | Not rated |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (RedTeam Flex does not)
- Higher Scalability score (7/10 vs 6/10)
- Higher Analytics score (7/10 vs 6/10)
Why choose RedTeam Flex

- Higher Support score (8/10 vs 7/10)
- Higher Cost score (5/10 vs 4/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
RedTeam Flex

Pros
- Project management and job financials such as WIP reports, AIA billing, and lien waivers sit in one system, so contractors need fewer separate tools.
- Reviewers on RFP.wiki rate support and training highly, and every client gets a dedicated implementation specialist and success manager.
- Drawing management includes OCR sheet naming, redlines, and revision overlays at no extra cost.
- Connects to contractor accounting systems including QuickBooks Online, Sage 100 Contractor, Sage 300 CRE, and Sage Intacct.
- Preconstruction tools support hard-bid, negotiated, and CMAR workflows.
Cons
- Users report lag and slow responses, especially at busy times.
- Setup and permissions take a lot of admin effort, and smaller teams may find configuration heavy.
- The mobile app trails the desktop version, and one superintendent reported it sometimes does not fully load in the field.
- Custom reporting and export options are limited.
- There is no public price list, uptime SLA, or security certification.
Not sold on either?
Frequently Asked Questions
Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 6.2/10 for RedTeam Flex. The largest gap is in Analytics: 7/10 for Asta Powerproject and 6/10 for RedTeam Flex.
Asta Powerproject has a free plan; RedTeam Flex does not list one.




