Asta Powerproject vs FARO Sphere XG (2026): Pricing, Features & Verdict
Asta Powerproject is our pick, scoring 6.3/10 against 5.9/10 for FARO Sphere XG on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Analytics score (7/10 vs 5/10). Only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

FARO Sphere XG
5.9/10
FARO Sphere XG is a cloud platform where construction, operations and geospatial teams process, view, measure and share point clouds, 360 photos and BIM models.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 5.9/10 |
| Scalability | 7/10 | 7/10 |
| Analytics | 7/10 | 5/10 |
| Support | 7/10 | 7/10 |
| Security | 5/10 | 8/10 |
| Cost | 4/10 | 4/10 |
| Customization | 7/10 | 5/10 |
| Ease of Use | 5/10 | 7/10 |
| Integration | 7/10 | 5/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Free ProjectViewer | Contact for pricing |
| Features | ||
| Digital Twin | Not listed | |
| LiDAR Processing | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs FARO Sphere XG cost by team size
| Team size | Asta Powerproject | FARO Sphere XG |
|---|---|---|
| 1 user | Contact for pricing | Contact for pricing |
| 5 users | FreeProjectViewer | Contact for pricing |
| 10 users | FreeProjectViewer | Contact for pricing |
| 25 users | FreeProjectViewer | Contact for pricing |
| 50 users | FreeProjectViewer | Contact for pricing |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and FARO Sphere XG suit
| Audience | Asta Powerproject | FARO Sphere XG |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 9/10Its floor plan progress tracking, 360 jobsite capture and record-keeping for disputes are aimed at construction projects. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 7/10Teams can align georeferenced models with point clouds to check for deviations and clashes. |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | 6/10FARO markets it to operations and facility teams for remote site visibility. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 7/10The Enterprise package adds multi-project dashboards, single sign-on and tiered user management. |
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | Not rated |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | Not rated |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | Not rated |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | Not rated |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | Not rated |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (FARO Sphere XG does not)
- Higher Analytics score (7/10 vs 5/10)
- Higher Customization score (7/10 vs 5/10)
Why choose FARO Sphere XG

- Higher Security score (8/10 vs 5/10)
- Higher Ease of Use score (7/10 vs 5/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
FARO Sphere XG

Pros
- It accepts data from FARO terrestrial and mobile scanners, from iPhone LiDAR and from 360 cameras, so mixed capture methods end up in one cloud project.
- The Stream app pre-registers Orbis scans in the field, which reduces failed registrations and repeat site visits.
- Scans are placed on floor plans and sorted by date, which suits progress documentation and dispute records.
- A SOC 2 Type 2 examination by A-LIGN covers FARO Sphere and HoloBuilder.
- Capterra reviewers give it a high average rating and mention responsive customer support.
Cons
- There is no public pricing. Every package needs a custom quote from FARO.
- It works best with FARO hardware, and third-party integrations are not well documented.
- Some reviewers say the editing layout is hard to navigate, and others say pricing could be better.
- It has no maintenance, work-order or asset-registry functions for industrial operations.
Not sold on either?

Air Inspection Automation (AiA)Our product
Plans DJI drone inspection missions for power line towers from LiDAR scans: it finds the towers, places photo stops, checks clearance, and splits the route into battery flights.
Made by the team behind b stack radar. Shown here because it fits this topic. It is not part of our rankings. How we rank tools
Frequently Asked Questions
Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.9/10 for FARO Sphere XG. The largest gap is in Security: 5/10 for Asta Powerproject and 8/10 for FARO Sphere XG.
Asta Powerproject has a free plan; FARO Sphere XG does not list one.




