InEight vs Trimble Tilos (2026): Pricing, Features & Verdict
InEight is our pick, scoring 6.3/10 against 5.9/10 for Trimble Tilos on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Scalability score (9/10 vs 7/10). Neither InEight nor Trimble Tilos lists a free plan.
Last updated: November 2026

InEight
6.3/10
InEight is a modular project controls platform for capital construction. Owners, contractors and engineering firms use it to manage cost, schedule, estimating, contracts and documents.

Trimble Tilos
5.9/10
Time-location scheduling software from Trimble for linear infrastructure projects such as highways, railways, pipelines and tunnels, used by contractors and civil engineers.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 5.9/10 |
| Scalability | 9/10 | 7/10 |
| Analytics | 8/10 | 6/10 |
| Support | 6/10 | 6/10 |
| Security | 6/10 | 5/10 |
| Cost | 3/10 | 3/10 |
| Customization | 7/10 | 7/10 |
| Ease of Use | 4/10 | 5/10 |
| Integration | 7/10 | 7/10 |
| Pricing | ||
| Free plan | No | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Contact for pricing | Contact for pricing |
| Features | ||
| File sharing | Not listed | |
| App integrations | ||
| Dashboards | Not listed | |
| Collaboration tools | Not listed | |
| Scheduling | ||
| Reporting | ||
| Timeline view | Not listed | |
| Gantt charts | Not listed | |
Who InEight and Trimble Tilos suit
| Audience | InEight | Trimble Tilos |
|---|---|---|
| Construction | 10/10It is built specifically for capital construction project controls. | 9/10Built for scheduling linear construction work such as highways, rail and pipelines. |
| Energy Companies | 8/10It is used on power, nuclear, and oil and gas projects, and Pattern Energy is a named customer. | 7/10Supports pipeline and transmission line projects. |
| Small Business | 2/10It is complex, quote-only software designed for large projects. | 3/10A reviewer notes the cost may be too high for smaller firms, and the specialist scope limits general use. |
| Engineering Firms | 8/10Engineering firms such as AECOM and WSP are named customers. | 8/10Civil engineers use it to plan linear projects, and it links to civil design tools such as Novapoint and Quadri. |
| Enterprise | 9/10It is aimed at large, complex programs with ERP integration and custom enterprise pricing. | Not rated |
| Government | Not rated | 6/10Suits infrastructure owners that plan road and rail corridors. |
Which One Should You Choose?
Why choose InEight

- Higher Scalability score (9/10 vs 7/10)
- Higher Analytics score (8/10 vs 6/10)
Why choose Trimble Tilos

- Higher Ease of Use score (5/10 vs 4/10)
Pros & Cons
InEight

Pros
- Cost, schedule, contracts and documents run on one shared data model, which reviewers say replaces scattered spreadsheets.
- Estimating draws on historical cost data, and scheduling supports what-if scenarios for bids and plans.
- Look-ahead planning ties field schedules to the master CPM schedule.
- More than 200 standard construction reports plus customizable dashboards, according to third-party listings.
- ERP integration syncs budgets, commitments and payments.
Cons
- Reviewers report an initial learning curve and complex navigation.
- No public pricing, and all plans require a custom quote.
- Some users want more comprehensive reporting.
- Too heavy for general business or small-team project management.
Trimble Tilos

Pros
- Time-distance diagrams show where and when each crew works along a corridor, which a Gantt chart alone cannot show.
- Planners can overlay cost and resource histograms and mass haul diagrams on the schedule to check earthmoving plans.
- Exchanges schedules with Microsoft Project, Primavera and Asta Powerproject, so it can sit alongside a main CPM schedule.
- Connects closely with Trimble civil software such as Business Center, Quadri and Trimble Connect.
- The few published user reviews are strongly positive, averaging about 4.7 out of 5 on Capterra.
Cons
- Built only for linear projects, so it adds little for buildings or other projects that do not follow a corridor.
- Reviewers mention a learning curve for people new to time-location planning.
- No public pricing, and third-party estimates conflict, so budgets need a vendor quote.
- Very few public user reviews to judge it by.
- Not built for team collaboration or task management for wider project teams.
Not sold on either?
Frequently Asked Questions
InEight scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.9/10 for Trimble Tilos. The largest gap is in Analytics: 8/10 for InEight and 6/10 for Trimble Tilos.
No, neither InEight nor Trimble Tilos lists a free plan.



