Asta Powerproject vs InEight (2026): Pricing, Features & Verdict
Asta Powerproject and InEight both score 6.3/10 on our Industrial & Infrastructure Software criteria. Only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

InEight
6.3/10
InEight is a modular project controls platform for capital construction. Owners, contractors and engineering firms use it to manage cost, schedule, estimating, contracts and documents.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 6.3/10 |
| Scalability | 7/10 | 9/10 |
| Analytics | 7/10 | 8/10 |
| Support | 7/10 | 6/10 |
| Security | 5/10 | 6/10 |
| Cost | 4/10 | 3/10 |
| Customization | 7/10 | 7/10 |
| Ease of Use | 5/10 | 4/10 |
| Integration | 7/10 | 7/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Free ProjectViewer | Contact for pricing |
| Features | ||
| App integrations | ||
| Spreadsheet interface | Not listed | |
| Dashboards | ||
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | ||
| Reporting | ||
| File sharing | Not listed | |
| Collaboration tools | Not listed | |
Asta Powerproject vs InEight cost by team size
| Team size | Asta Powerproject | InEight |
|---|---|---|
| 1 user | Contact for pricing | Contact for pricing |
| 5 users | FreeProjectViewer | Contact for pricing |
| 10 users | FreeProjectViewer | Contact for pricing |
| 25 users | FreeProjectViewer | Contact for pricing |
| 50 users | FreeProjectViewer | Contact for pricing |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and InEight suit
Asta Powerproject fits small business better; InEight fits enterprise better.
| Audience | Asta Powerproject | InEight |
|---|---|---|
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 2/10It is complex, quote-only software designed for large projects. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 9/10It is aimed at large, complex programs with ERP integration and custom enterprise pricing. |
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 10/10It is built specifically for capital construction project controls. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 8/10Engineering firms such as AECOM and WSP are named customers. |
| Energy Companies | Not rated | 8/10It is used on power, nuclear, and oil and gas projects, and Pattern Energy is a named customer. |
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | Not rated |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | Not rated |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | Not rated |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | Not rated |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | Not rated |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (InEight does not)
- Higher Support score (7/10 vs 6/10)
- Higher Cost score (4/10 vs 3/10)
- Better fit for small business (5/10 vs 2/10)
Why choose InEight

- Higher Scalability score (9/10 vs 7/10)
- Higher Analytics score (8/10 vs 7/10)
- Better fit for enterprise (9/10 vs 7/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
InEight

Pros
- Cost, schedule, contracts and documents run on one shared data model, which reviewers say replaces scattered spreadsheets.
- Estimating draws on historical cost data, and scheduling supports what-if scenarios for bids and plans.
- Look-ahead planning ties field schedules to the master CPM schedule.
- More than 200 standard construction reports plus customizable dashboards, according to third-party listings.
- ERP integration syncs budgets, commitments and payments.
Cons
- Reviewers report an initial learning curve and complex navigation.
- No public pricing, and all plans require a custom quote.
- Some users want more comprehensive reporting.
- Too heavy for general business or small-team project management.
Not sold on either?
Frequently Asked Questions
Asta Powerproject and InEight both score 6.3/10 on our Industrial & Infrastructure Software criteria. The largest gap is in Scalability: 7/10 for Asta Powerproject and 9/10 for InEight.
Asta Powerproject has a free plan; InEight does not list one.
Asta Powerproject is the better fit for small business: we rate it 5/10 for them, against 2/10 for InEight.

