Asta Powerproject vs INGENIOUS.BUILD (2026): Pricing, Features & Verdict
Asta Powerproject and INGENIOUS.BUILD both score 6.3/10 on our Industrial & Infrastructure Software criteria. For 10 users, Asta Powerproject and INGENIOUS.BUILD are both free; both Asta Powerproject and INGENIOUS.BUILD have a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

INGENIOUS.BUILD
6.3/10
Cloud construction project management platform that connects owners, developers, contractors and designers to share financials, documents and construction administration from preconstruction to closeout.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 6.3/10 |
| Scalability | 7/10 | 7/10 |
| Analytics | 7/10 | 6/10 |
| Support | 7/10 | 5/10 |
| Security | 5/10 | 8/10 |
| Cost | 4/10 | 5/10 |
| Customization | 7/10 | 6/10 |
| Ease of Use | 5/10 | 7/10 |
| Integration | 7/10 | 7/10 |
| Pricing | ||
| Free plan | Yes | Yes |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Free ProjectViewer | Free Basic (external collaborators) |
| Features | ||
| Document Control | Not listed | |
| More features | ||
| App integrations | Not listed | |
| Spreadsheet interface | Not listed | |
| Dashboards | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Gantt charts | Not listed | |
| Scheduling | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs INGENIOUS.BUILD cost by team size
Asta Powerproject and INGENIOUS.BUILD cost the same from 5 users.
| Team size | Asta Powerproject | INGENIOUS.BUILD |
|---|---|---|
| 1 user | Contact for pricing | FreeBasic (external collaborators) |
| 5 users | FreeProjectViewer | FreeBasic (external collaborators) |
| 10 users | FreeProjectViewer | FreeBasic (external collaborators) |
| 25 users | FreeProjectViewer | FreeBasic (external collaborators) |
| 50 users | FreeProjectViewer | FreeBasic (external collaborators) |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and INGENIOUS.BUILD suit
Asta Powerproject fits construction and engineering firms better than INGENIOUS.BUILD.
| Audience | Asta Powerproject | INGENIOUS.BUILD |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 8/10Covers RFIs, submittals, pay apps and closeout for general contractors and trades. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 6/10Architects and engineers can collaborate on RFIs and submittals, but there are no design tools. |
| Small Business | 5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training. | 4/10There is no free tier for internal users, and annual contracts with a five-user minimum are required. |
| Mid-Market | 7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools. | 7/10A five-user minimum and annual per-user contracts suit mid-sized development firms. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | Not rated |
| Field Teams | 5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner. | Not rated |
| Finance Teams | 4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system. | Not rated |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
| Operations Teams | 5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation. | Not rated |
| Real Estate | Not rated | 9/10Built primarily for owners, developers and owner's reps, with Yardi integration and capital planning. |
| Remote Teams | 4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer. | Not rated |
| Startups | 2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Higher Support score (7/10 vs 5/10)
- Higher Analytics score (7/10 vs 6/10)
- Better fit for construction (10/10 vs 8/10)
- Better fit for engineering firms (8/10 vs 6/10)
Why choose INGENIOUS.BUILD

- Higher Security score (8/10 vs 5/10)
- Higher Ease of Use score (7/10 vs 5/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
INGENIOUS.BUILD

Pros
- Project financials and construction administration such as RFIs, submittals and punch lists run in one system, so owners do not have to reconcile a separate cost tool.
- External collaborators join free and projects are unlimited, which keeps costs predictable on multi-party developments.
- Two-way accounting sync with QuickBooks, Xero, Sage Intacct, Yardi Voyager and Dynamics 365.
- The vendor states SOC 2 Type II and ISO/IEC 27001 certifications, along with role-based access and audit logs.
- The Pro plan includes an MCP server and API, so AI tools can query live project data with permissions intact.
Cons
- There is no public rate card, so prices require the calculator or a sales call.
- An annual contract and a five-user minimum are required.
- Independent reviews are scarce, with about 14 on G2 and none on Capterra, and some reviewers say forms are weak.
- It has no asset registry, maintenance or field inspection depth for operating infrastructure.
- Capital planning, custom reporting and support cost extra.
Not sold on either?
Frequently Asked Questions
Asta Powerproject and INGENIOUS.BUILD both score 6.3/10 on our Industrial & Infrastructure Software criteria. The largest gap is in Security: 5/10 for Asta Powerproject and 8/10 for INGENIOUS.BUILD.
Both are free for 10 users.
Yes, both Asta Powerproject and INGENIOUS.BUILD have a free plan.
Asta Powerproject is the better fit for construction: we rate it 10/10 for them, against 8/10 for INGENIOUS.BUILD.

