b stack radar

Asta Powerproject vs BIMcollab (2026): Pricing, Features & Verdict

BIMcollab is our pick, scoring 6.8/10 against 6.3/10 for Asta Powerproject on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Cost score (7/10 vs 4/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

BIMcollab logo

BIMcollab

6.8/10

Winner

Cloud platform for BIM coordination, issue management, document control and model checking, used by construction, engineering and building-owner teams.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
BIMcollab logo
BIMcollab
Scores
Overall Rating6.3/106.8/10
Scalability7/107/10
Analytics7/106/10
Support7/106/10
Security5/106/10
Cost4/107/10
Customization7/107/10
Ease of Use5/107/10
Integration7/108/10
Pricing
Free planYesNo
Cheapest paid planContact for pricing€19/user/mo
Basic
Estimated cost for 10 usersFree
ProjectViewer
€190/mo
Basic
Features
Digital TwinNot listed
Document ControlNot listed
Engineering DesignNot listed
More features
App integrationsNot listed
Spreadsheet interfaceNot listed
DashboardsNot listed
Timeline viewNot listed
Task managementNot listed
Gantt chartsNot listed
SchedulingNot listed
ReportingNot listed

Asta Powerproject vs BIMcollab cost by team size

Team sizeAsta PowerprojectBIMcollab
1 userContact for pricing€19/moBasic
5 usersFreeProjectViewer€95/moBasic
10 usersFreeProjectViewer€190/moBasic
25 usersFreeProjectViewer€475/moBasic
50 usersFreeProjectViewer€950/moBasic

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and BIMcollab suit

Asta Powerproject fits field teams better; BIMcollab fits freelancers and remote teams better.

AudienceAsta PowerprojectBIMcollab
Field Teams5/10Site progress updates require the separately licensed Asta Siteprogress app, so field crews are an add-on to the desktop planner.2/10The notes say it has no maintenance, work-order, or field-operations features.
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.5/10A single BIM coordinator can buy a per-user Basic seat with the IFC viewer and BCF plugins, but the platform is built for multi-party project coordination.
Remote Teams4/10The desktop app runs only on 64-bit Windows, Mac users need the SaaS subscription, and other people are limited to the free ProjectViewer.6/10The streaming WebViewer opens federated models in the browser and issue management is cloud-based, so coordinators do not have to be in one office.
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.9/10It is built for clash detection and issue coordination between contractors and design teams.
Small Business5/10The notes say it works on small jobs, but a subscription is estimated at about 1,300 to 1,700 US dollars per user per year plus multi-day training.6/10Published pricing starts at 19 euros per user per month, or 12.50 euros on annual billing, so a small project team can subscribe without a custom contract.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.8/10Engineering firms use the IDS model checks and BCF issue workflows with their authoring tools.
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.7/10The Enterprise tier adds phase teams, custom roles and multi-project locations.
Finance Teams4/10Planners can cost-load a programme and track earned value, but the tool is not a company accounting system.Not rated
Maintenance TeamsNot rated2/10The same limit is explicit: there are no maintenance or work-order features, only BIM coordination and document control.
Mid-Market7/10It is used by UK contractors on both large and small jobs, with concurrent licensing and Asta Enterprise for shared resource pools.Not rated
Operations Teams5/10Resource planning, cost loading, baselines, and what-if scenarios are project-controls work for a contractor's delivery operation.Not rated
Real EstateNot rated6/10Building owners such as universities and hospitals use Twin to manage documents and assets.
Startups2/10Specialist Windows planning seats are priced like professional planner licences, with no low-cost tier for a young company.Not rated

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (BIMcollab does not)
  • Higher Analytics score (7/10 vs 6/10)
  • Higher Support score (7/10 vs 6/10)
  • Better fit for field teams (5/10 vs 2/10)

BIMcollab logo
Why choose BIMcollab

  • Higher Cost score (7/10 vs 4/10)
  • Higher Ease of Use score (7/10 vs 5/10)
  • Better fit for freelancers (5/10 vs 3/10)
  • Better fit for remote teams (6/10 vs 4/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

BIMcollab logo
BIMcollab

Pros

  • Clear published per-user prices from 19 euros a month, with about a 35 percent discount on annual billing.
  • Uses open standards (IFC, BCF, IDS), so mixed Revit, Archicad and other teams can coordinate in one place.
  • Its streaming WebViewer opens large federated models in the browser.
  • Reviewers on G2 and Capterra praise how easy clash identification is.

Cons

  • Reviewers report slow file exports.
  • Issue lists can get out of control on large projects unless the team enforces strict issue-creation rules.
  • Zoom model checking costs extra on top of the platform tiers.
  • It has no maintenance, work-order or field-operations features.

Not sold on either?

Frequently Asked Questions

BIMcollab scores higher on our Industrial & Infrastructure Software criteria: 6.8/10 against 6.3/10 for Asta Powerproject. The largest gap is in Cost: 4/10 for Asta Powerproject and 7/10 for BIMcollab.

Asta Powerproject has a free plan; BIMcollab does not list one.

Asta Powerproject is the better fit for field teams: we rate it 5/10 for them, against 2/10 for BIMcollab.

Related Comparisons