FMX vs Power Factors (2026): Pricing, Features & Verdict
Power Factors is our pick, scoring 6.8/10 against 5.8/10 for FMX on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Analytics score (8/10 vs 5/10). Neither FMX nor Power Factors lists a free plan.
Last updated: November 2026

FMX
5.8/10
Cloud-based facilities maintenance and work order software for schools, churches, and multi-building organizations. It covers requests, preventive maintenance, event scheduling, and inventory.

Power Factors
6.8/10
Unity is Power Factors' software suite for monitoring, controlling, and maintaining utility-scale solar, wind, and battery fleets.
Feature-by-Feature Comparison
| Feature | ![]() | ![]() |
|---|---|---|
| Scores | ||
| Overall Rating | 5.8/10 | 6.8/10 |
| Analytics | 5/10 | 8/10 |
| Cost | 5/10 | 3/10 |
| Customization | 4/10 | 7/10 |
| Ease of Use | 8/10 | 5/10 |
| Integration | 5/10 | 8/10 |
| Scalability | 6/10 | 9/10 |
| Security | 5/10 | 8/10 |
| Support | 8/10 | 6/10 |
| Pricing | ||
| Free plan | No | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Contact for pricing | Contact for pricing |
| Features | ||
| Asset Registry | ||
| Preventive Maintenance | ||
| Spare Parts Inventory | ||
| Work Orders | ||
| Condition Monitoring | Not listed | |
| Digital Twin | Not listed | |
| Drone Inspection | Not listed | |
| Engineering Design | Not listed | |
| Engineering Simulation | Not listed | |
| GIS and Mapping | Not listed | |
| Inspection Automation | Not listed | |
| Inspection Checklists | Not listed | |
| LiDAR Processing | Not listed | |
| Offline Field App | Not listed | |
| Power Line Inspection | Not listed | |
| Predictive Maintenance | Not listed | |
| Safety and Compliance | Not listed | |
| SCADA and IoT Integration | Not listed | |
Who FMX and Power Factors suit
Power Factors fits operations teams better than FMX.
| Audience | FMX | Power Factors |
|---|---|---|
| Operations Teams | 7/10The event scheduling, utility, and fleet modules extend it beyond maintenance into broader facility operations. | 9/10Remote operations centers get fleet-to-device SCADA, loss categorization, and dispatch tied to asset criticality. |
| Maintenance Teams | 8/10Work requests, preventive maintenance, and inventory are the core of the product. | 8/10Field service covers preventive, corrective, and emergency work orders, checklists, parts, and condition-based triggers from performance data. |
| Education | 9/10Public K-12 districts get enrollment-based pricing with unlimited users, and Capterra lists education as a main customer group. | Not rated |
| Energy Companies | Not rated | 10/10Unity is built only for renewable generators, covering solar, wind, battery storage, and hybrid plants from SCADA through commercial settlement. |
| Enterprise | Not rated | 9/10The vendor reports 600-plus customers and more than 310 gigawatts under management, and the product is sold as a multi-module enterprise project. |
| Field Teams | Not rated | 8/10Technicians get a mobile app with asset history, inspections, photos, job hazard analysis, and offline work-order updates at remote plants. |
| Manufacturing | 3/10No condition monitoring or predictive maintenance was found, and the product is built for facilities rather than production equipment. | Not rated |
| Mid-Market | Not rated | 3/10Independent reviews say the suite is impractical below utility scale because pricing is quote-only and SCADA is a commissioned engineering project. |
| Nonprofits | 7/10Capterra lists religious organizations as a main customer group. | Not rated |
| Small Business | Not rated | 2/10Reviewers say rooftop installers, single sites, and small teams would pay for far more system than they need. |
| Utilities | Not rated | 8/10Independent power producers and utilities use it for utility-scale fleets and grid-code plant control, though it is not a transmission and distribution network tool. |
Which One Should You Choose?
Why choose FMX

- Higher Ease of Use score (8/10 vs 5/10)
- Higher Cost score (5/10 vs 3/10)
Why choose Power Factors

- Higher Analytics score (8/10 vs 5/10)
- Higher Customization score (7/10 vs 4/10)
- Better fit for operations teams (9/10 vs 7/10)
Pros & Cons
FMX

Pros
- Users who only submit requests and outside vendors are not billed, so staff and community access across a whole campus does not raise the price.
- K-12 districts get pricing based on student enrollment with unlimited users.
- Capterra reviewers rate it about 4.7 out of 5 across more than 400 reviews, often praising its ease of use and support.
- One platform combines maintenance, event and facility scheduling, inventory, capital planning, utility, fleet, and IT asset modules.
- It can be bought through the 1GPA, TIPS-USA, and AEPA purchasing co-ops, which suits public buyers.
Cons
- No public prices, and a one-time implementation fee applies.
- Reviewers describe it as built for facilities ticketing, with limited room for custom form logic, conditional workflows, and tailored dashboards.
- A competitor's review says updating tasks on a phone can be slow, and no offline mode is documented.
- The public pages do not name its out-of-the-box integrations.
- There is no industrial condition monitoring, IoT connection, or predictive maintenance.
Power Factors

Pros
- One vendor covers local and central SCADA, plant control, battery energy management, performance analytics, field work orders, and invoicing for solar, wind, and storage.
- SCADA accepts multi-vendor plants over IEC 61850, IEC 60870-5-104, DNP3, Modbus, and OPC-UA, so mixed OEM fleets do not need a separate monitor per brand.
- Asset performance management ranks losses such as soiling, degradation, and curtailment and can open field work from those events, which Origis Energy uses to chase plant performance.
- Field technicians can complete inspections, photos, and work orders offline, then sync when service returns, which matters at remote renewable sites.
- The vendor publishes ISO 27001, ISO 27017, and ISO 27019 certificates and says SCADA is built toward NERC CIP, NIS2, and IEC 62443.
Cons
- No public prices, plan comparison, or free trial, so cost is unknown until a sales quote.
- SCADA and plant controllers are designed, factory-tested, and commissioned per site, so rollout is an engineering project rather than a software install.
- Independent 2026 reviews describe a high learning curve and say the suite is a poor fit for a single small plant or a team that only needs work orders.
- Public user reviews are almost absent: a Gartner Peer Insights page for UNITY had no reviews, and Capterra showed no reviewer ratings for the PowerFactors listing.
- The vendor's own Unity page says the REMI intelligence layer is still coming to monitoring and control, so agent-style automation is not yet across the whole suite.
Not sold on either?
Frequently Asked Questions
Power Factors scores higher on our Industrial & Infrastructure Software criteria: 6.8/10 against 5.8/10 for FMX. The largest gap is in Analytics: 5/10 for FMX and 8/10 for Power Factors.
No, neither FMX nor Power Factors lists a free plan.
Power Factors is the better fit for operations teams: we rate it 9/10 for them, against 7/10 for FMX.




