Asta Powerproject vs Trimble Connect (2026): Pricing, Features & Verdict
Asta Powerproject is our pick, scoring 6.3/10 against 5.7/10 for Trimble Connect on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Support score (7/10 vs 5/10). For 10 users, Asta Powerproject and Trimble Connect are both free; both Asta Powerproject and Trimble Connect have a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.
Trimble Connect
5.7/10
Trimble Connect is a cloud common data environment for construction and engineering teams to view, coordinate, and share 2D/3D BIM models and project files.
Feature-by-Feature Comparison
| Feature | ![]() | T Trimble Connect |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 5.7/10 |
| Integration | 7/10 | 7/10 |
| Security | 5/10 | 7/10 |
| Support | 7/10 | 5/10 |
| Cost | 4/10 | 6/10 |
| Analytics | 7/10 | 5/10 |
| Ease of Use | 5/10 | 5/10 |
| Customization | 7/10 | 5/10 |
| Scalability | 7/10 | 7/10 |
| Pricing | ||
| Free plan | Yes | Yes |
| Cheapest paid plan | Contact for pricing | $349/user/mo Pro |
| Estimated cost for 10 users | Free ProjectViewer | Free Free |
| Features | ||
| Digital Twin | Not listed | |
| Document Control | Not listed | |
| More features | ||
| Scheduling | Not listed | |
| Spreadsheet interface | Not listed | |
| App integrations | Not listed | |
| Gantt charts | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Dashboards | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs Trimble Connect cost by team size
Asta Powerproject and Trimble Connect cost the same from 5 users.
| Team size | Asta Powerproject | Trimble Connect |
|---|---|---|
| 1 user | Contact for pricing | FreeFree |
| 5 users | FreeProjectViewer | FreeFree |
| 10 users | FreeProjectViewer | FreeFree |
| 25 users | FreeProjectViewer | FreeFree |
| 50 users | FreeProjectViewer | FreeFree |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and Trimble Connect suit
| Audience | Asta Powerproject | Trimble Connect |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 9/10Trimble built it as a common data environment for construction project coordination. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | 8/10It supports BIM model coordination with Tekla, SketchUp, Revit, and IFC files. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 7/10Volume pricing for 30 or more users and enterprise governance are offered. |
| Field Teams | Not rated | 6/10Mobile apps let field staff view models, but users report that mobile performance is inconsistent. |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
Which One Should You Choose?
Why choose Asta Powerproject

- Higher Support score (7/10 vs 5/10)
- Higher Analytics score (7/10 vs 5/10)
TWhy choose Trimble Connect
- Higher Security score (7/10 vs 5/10)
- Higher Cost score (6/10 vs 4/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
TTrimble Connect
Pros
- Opens more than 45 file types, including IFC and geospatial formats, so mixed-vendor BIM teams can coordinate in one place.
- Connects natively with Trimble tools such as Tekla, SketchUp, ProjectSight, and FieldPoints.
- A free tier still covers viewing, coordination, and file sharing.
- A 30-day trial includes the full Innovate feature set.
Cons
- In 2025, forum users reported slow web app and 3D viewer loading, plus freezes.
- Measuring tools in the 3D viewer have broken in past releases.
- Reviewers say the technical interface takes time to learn and that mobile markups can lag.
- A Capterra reviewer said the desktop app needs an active internet connection to run.
Not sold on either?
Frequently Asked Questions
Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 5.7/10 for Trimble Connect. The largest gap is in Analytics: 7/10 for Asta Powerproject and 5/10 for Trimble Connect.
Both are free for 10 users.
Yes, both Asta Powerproject and Trimble Connect have a free plan.




