Asta Powerproject vs Sitetracker (2026): Pricing, Features & Verdict
Asta Powerproject is our pick, scoring 6.3/10 against 6.2/10 for Sitetracker on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Support score (7/10 vs 6/10). Only Asta Powerproject has a free plan.
Last updated: November 2026

Asta Powerproject
6.3/10
A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.
Sitetracker
6.2/10
Sitetracker is a Salesforce-based asset lifecycle management platform that telecom, energy, and infrastructure owners use to plan, build, operate, and maintain distributed sites and assets.
Feature-by-Feature Comparison
| Feature | ![]() | |
|---|---|---|
| Scores | ||
| Overall Rating | 6.3/10 | 6.2/10 |
| Integration | 7/10 | 7/10 |
| Security | 5/10 | 7/10 |
| Support | 7/10 | 6/10 |
| Cost | 4/10 | 3/10 |
| Analytics | 7/10 | 6/10 |
| Ease of Use | 5/10 | 5/10 |
| Customization | 7/10 | 7/10 |
| Scalability | 7/10 | 8/10 |
| Pricing | ||
| Free plan | Yes | No |
| Cheapest paid plan | Contact for pricing | Contact for pricing |
| Estimated cost for 10 users | Free ProjectViewer | Contact for pricing |
| Features | ||
| Asset Registry | Not listed | |
| GIS and Mapping | Not listed | |
| Inspection Checklists | Not listed | |
| Offline Field App | Not listed | |
| Safety and Compliance | Not listed | |
| Work Orders | Not listed | |
| More features | ||
| Scheduling | Not listed | |
| Spreadsheet interface | Not listed | |
| App integrations | Not listed | |
| Gantt charts | Not listed | |
| Timeline view | Not listed | |
| Task management | Not listed | |
| Dashboards | Not listed | |
| Reporting | Not listed | |
Asta Powerproject vs Sitetracker cost by team size
| Team size | Asta Powerproject | Sitetracker |
|---|---|---|
| 1 user | Contact for pricing | Contact for pricing |
| 5 users | FreeProjectViewer | Contact for pricing |
| 10 users | FreeProjectViewer | Contact for pricing |
| 25 users | FreeProjectViewer | Contact for pricing |
| 50 users | FreeProjectViewer | Contact for pricing |
The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.
Who Asta Powerproject and Sitetracker suit
Asta Powerproject fits construction better; Sitetracker fits enterprise better.
| Audience | Asta Powerproject | Sitetracker |
|---|---|---|
| Construction | 10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app. | 7/10Construction and engineering is one of the vendor's named industries, with project and financial tracking. |
| Enterprise | 7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall. | 9/10Large carriers such as AT&T, T-Mobile, and Vodafone use it, and the reported entry price is high. |
| Energy Companies | Not rated | 8/10Renewables, battery storage, and EV charging are core target industries, and RWE, Engie, and EVgo are named customers. |
| Engineering Firms | 8/10Critical path, resource and earned value tools suit engineering and infrastructure planners. | Not rated |
| Field Teams | Not rated | 8/10The mobile app provides forms, geotagged photos, scanning, and time tracking for field crews. |
| Freelancers | 3/10Per-seat cost and training needs make it a poor fit for occasional individual users. | Not rated |
| Small Business | Not rated | 2/10A reported starting price of about 20,000 US dollars and Salesforce-based customization make it a poor fit for small firms. |
| Utilities | Not rated | 7/10Sitetracker markets to utilities and lists Southern Company as a customer. |
Which One Should You Choose?
Why choose Asta Powerproject

- Has a free plan (Sitetracker does not)
- Higher Support score (7/10 vs 6/10)
- Higher Cost score (4/10 vs 3/10)
- Better fit for construction (10/10 vs 7/10)
Why choose Sitetracker
- Higher Security score (7/10 vs 5/10)
- Higher Scalability score (8/10 vs 7/10)
- Better fit for enterprise (9/10 vs 7/10)
Pros & Cons
Asta Powerproject

Pros
- Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
- Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
- The BIM module links programmes to 3D models for 4D planning.
- The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
- Concurrent licensing lowers the per-user cost for planning teams that share seats.
Cons
- Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
- The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
- Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
- Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
- Exporting to Microsoft Project can lose hammock tasks and custom calendars.
Sitetracker
Pros
- Covers the whole infrastructure lifecycle in one platform, from site planning and permitting through construction and maintenance.
- Strong record in telecom, with major carriers and tower operators as named customers.
- The mobile app combines standardized inspection and install forms, geotagged photos, video, signatures, and barcode scanning.
- Built on Salesforce, so it inherits that platform's data model and integration options, and it offers APIs to ERP, OSS/BSS, and GIS systems.
Cons
- No public pricing, and directories cite a starting price of about 20,000 USD.
- G2 reviewers report that customization usually needs costly dedicated resources.
- Some users find it slower than comparable systems, and App Store reviews mention lag and repeated login prompts.
- No sensor-based condition monitoring or predictive maintenance.
Not sold on either?
Frequently Asked Questions
Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 6.2/10 for Sitetracker. The largest gap is in Security: 5/10 for Asta Powerproject and 7/10 for Sitetracker.
Asta Powerproject has a free plan; Sitetracker does not list one.
Asta Powerproject is the better fit for construction: we rate it 10/10 for them, against 7/10 for Sitetracker.




