Asta Powerproject vs Render Networks (2026): Pricing, Features & Verdict

Asta Powerproject is our pick, scoring 6.3/10 against 6.2/10 for Render Networks on our Industrial & Infrastructure Software criteria. Its biggest advantage: higher Integration score (7/10 vs 6/10). Only Asta Powerproject has a free plan.

Last updated: November 2026

Asta Powerproject logo

Asta Powerproject

6.3/10

Winner

A Windows desktop planning tool from Eleco that construction planners use for critical path Gantt scheduling, resource and cost planning, and 4D BIM programmes.

Render Networks logo

Render Networks

6.2/10

A geospatial construction management platform that fiber, broadband and electric utility network builders use to plan field work, run it, record as-builts and reconcile it for payment.

Feature-by-Feature Comparison

Feature
Asta Powerproject logo
Asta Powerproject
Render Networks logo
Render Networks
Scores
Overall Rating6.3/106.2/10
Integration7/106/10
Security5/107/10
Support7/106/10
Cost4/104/10
Analytics7/107/10
Ease of Use5/106/10
Customization7/106/10
Scalability7/108/10
Pricing
Free planYesNo
Cheapest paid planContact for pricingContact for pricing
Estimated cost for 10 usersFree
ProjectViewer
Contact for pricing
Features
GIS and MappingNot listed
Inspection ChecklistsNot listed
Offline Field AppNot listed
Work OrdersNot listed
More features
SchedulingNot listed
Spreadsheet interfaceNot listed
App integrationsNot listed
Gantt chartsNot listed
Timeline viewNot listed
Task managementNot listed
DashboardsNot listed
ReportingNot listed

Asta Powerproject vs Render Networks cost by team size

Team sizeAsta PowerprojectRender Networks
1 userContact for pricingContact for pricing
5 usersFreeProjectViewerContact for pricing
10 usersFreeProjectViewerContact for pricing
25 usersFreeProjectViewerContact for pricing
50 usersFreeProjectViewerContact for pricing

The plan that fits each team size, billed monthly, before add-ons and usage charges. Each cost opens that tool's pricing calculator for the team size.

Who Asta Powerproject and Render Networks suit

Asta Powerproject fits construction better than Render Networks.

AudienceAsta PowerprojectRender Networks
Construction10/10Built and marketed for construction programme planning, with 4D BIM and a site progress app.8/10Network construction contractors use it to run field tasks, closeout and invoicing.
Energy CompaniesNot rated6/10The mPower acquisition extends it into electric infrastructure projects.
Engineering Firms8/10Critical path, resource and earned value tools suit engineering and infrastructure planners.Not rated
Enterprise7/10Concurrent licensing and Asta Enterprise support large contractors such as Willmott Dixon and Morgan Sindall.Not rated
Field TeamsNot rated8/10The mobile app supports offline design layers, task updates and GPS as-built capture.
Freelancers3/10Per-seat cost and training needs make it a poor fit for occasional individual users.Not rated
Small BusinessNot rated2/10It is an enterprise platform sold through demos and aimed at large network builds.
UtilitiesNot rated9/10Electric cooperatives and municipal utilities building fiber, along with electric work through mPower, are the core customers.

Which One Should You Choose?

Asta Powerproject logo
Why choose Asta Powerproject

  • Has a free plan (Render Networks does not)
  • Higher Integration score (7/10 vs 6/10)
  • Higher Support score (7/10 vs 6/10)
  • Better fit for construction (10/10 vs 8/10)

Render Networks logo
Why choose Render Networks

  • Higher Security score (7/10 vs 5/10)
  • Higher Ease of Use score (6/10 vs 5/10)

Pros & Cons

Asta Powerproject logo
Asta Powerproject

Pros

  • Critical path, float, multiple baseline and DCMA quality checks give planners depth close to Primavera P6.
  • Imports and exports P6 XER and XML and Microsoft Project files, so contract-mandated formats can still be delivered.
  • The BIM module links programmes to 3D models for 4D planning.
  • The free ProjectViewer lets clients and subcontractors open plans without buying a seat.
  • Concurrent licensing lowers the per-user cost for planning teams that share seats.

Cons

  • Eleco publishes no prices. Third parties estimate about 1,300 to 1,700 USD per user per year, and reviewers call the pricing discouraging.
  • The desktop app runs only on 64-bit Windows, and Mac users need the SaaS subscription.
  • Reviewers report a steep learning curve, and Eleco sells multi-day training courses.
  • Field progress updates need the separately licensed Siteprogress app, and shared resource pools need Asta Enterprise.
  • Exporting to Microsoft Project can lose hammock tasks and custom calendars.

Render Networks logo
Render Networks

Pros

  • It is built specifically for fiber and network construction, turning designs into geolocated field tasks.
  • The offline mobile app lets crews save design areas to the device and keep updating tasks in low-connectivity zones.
  • Field work is linked to contract rates, which speeds up closeout and invoicing.
  • Large references include Lumen, nbn, Shentel and several electric cooperatives.
  • It holds ISO 27001 certification.

Cons

  • No public pricing.
  • Very few independent user reviews on G2, Capterra or Reddit.
  • It is narrowly focused on linear network builds, not general maintenance or CMMS work.
  • Beyond Trimble GNSS, few third-party integrations are documented publicly.

Not sold on either?

Frequently Asked Questions

Asta Powerproject scores higher on our Industrial & Infrastructure Software criteria: 6.3/10 against 6.2/10 for Render Networks. The largest gap is in Security: 5/10 for Asta Powerproject and 7/10 for Render Networks.

Asta Powerproject has a free plan; Render Networks does not list one.

Asta Powerproject is the better fit for construction: we rate it 10/10 for them, against 8/10 for Render Networks.